CONTRACT NUMBERCONTRACT DESCRIPTIONCONTRACT AMOUNTAGENCYDATE OF COMPLETION
JFK-124.013Supervisory Control and Data Acquisition Systems (SCADA), $2,260,208 PORT AUTHORITY NY & NJCURRENT
JFK-964.201Access and Safety Improvement at Building #161 (Fire Pump Station), $1,362,300 PORT AUTHORITY NY & NJCURRENT
HH-88AHenry Hudson Bridge Administration Building $4,820,257 TRIBOROUGH BRIDGE & TUNNELCURRENT
C-40203Furnishing and Installing Emergency Generators at Various MTABC Bus Depots, Queens, Bronx and Yonkers $7,600,000 NYC TRANSITCURRENT
JFK1050Replacement of Fire Alarm System at Air Control Tower $2,137,550 PORT AUTHORITY NY & NJCURRENT
Grand Central Station CCNe $3,228,000 Ericsson, Inc.CURRENT
D262798ITS Truck Intrusion Warning System $1,501,842 NYS DOTCURRENT
VERIZON - 37th Street, NYCVerizon 37th Street $2,808,957 VERIZON/TISHMAN CONSTRUCTIONCURRENT
VERIZON - 38th Street, NYCVerizon 38th Street $3,206,004 VERIZON/TISHMAN CONSTRUCTIONCURRENT
Ferry Terminal Upland Work $3,418,000 NYCEDC / SkanskaCURRENT
GCT T&M $4,051,000 Ericsson, Inc.CURRENT
B-26009Security Upgrade Eastchester and LaGuardia Bus Depots Ð NYC Transit Authority $1,690,393 NYC TRANSIT12/31/15
P-36418Rehabilitation of Two Circuit Breaker Houses No.Õs 74 & 74A $3,424,807 NYC TRANSIT
MF-100.511.27CCTV Camera System Upgrade & Replacement at Staten Island Bridges $3,834,168 PORT AUTHORITY NY & NJ / Tishman Technologies1/31/16
MF-100.511.28JFK International Airport Security System Infrastructure $2,365,425 PORT AUTHORITY NY & NJ
10-2047HHC ELEVATOR $595,909 HHC
A-36041FURNISH AND INSTALL THREE ADA ELEVATORS AT THE KINGSBRIDGE ROAD STATION. REHABILITATION OF EXISTING STATION. $2,592,418 NYC TRANSIT
4380014 BUSH TERMINCOMPLETE SITE DEVELOPMENT OF BUSH TERMINAL PARK WITH SUBSTATION, UTILITES, COMFORT STATION, PATHS, LIGHTING, BALL FIELDSAL $1,136,549 NYCEDC
MF100.511.5PATH 33rd Street Station Access Control & CCTV System Upgrade $1,119,613 PORT AUTHORITY NY & NJ / Tishman Technologies
C-40646Electronic Security Systems at College Point Bus Depot, Queens $1,921,575 NYC TRANSIT12/31/13
WTC-324.359.03WORLD TRADE CENTER TOWER 4 - FURNISH AND INSTALL FINAL STREETS AND SIDEWALK SURFACES INCLUDING GRANITE PAVING, BOLLARDS, STREET LIGHTING, FIRE HYDRANTS $1,616,743 PORT AUTHORITY NY & NJ
PW-054NYC - DEP WPCP Water Samplers $2,706,300 NYC DEP
LGA Air Traffic Control Tower Demo $1,600,000 FAA
PO-83SHARON BNR $5,825,000 NYC DEP
MTA 5 StationsFt Hamilton Parkway/West End 5 Stations $9,832,685 NYC TRANSIT
PS-232ORCHARD BEACH Pump Station $550,000 NYC DEP
P-36422Construction of a Circuit Breaker house $1,795,000 NYC TRANSIT
SC1-ENYC DEPT SPRING CREEK WPCP ELECTRICAL UPGRADE - ALL SYSTEMS $9,490,000 NYC DEP C/O HAMLET ELECTRIC10/15/10
SC1-GINSTRUMENTATION AND PROCESS CONTROL WORK $750,000 NYC DEP C/O HAMLET ELECTRIC9/30/09
JFK-966CARGO PAD 'C' 5KV UPGRADE $578,000 PA OF NY & NJ6/30/09
JFK-916 BUILDING #161, FIRE PUMP STATION REHABILITATION $780,000 PA OF NY & NJ C/O JOHN PICONE, INC.6/30/11
WI-74E WARDS ISLAND WPCP-GAS DETECTION, PUMP, AND LIGHTING SYSTEM UPGRADE $9,452,570 NYC DEP10/15/10
PW-054WPCP WATER SAMPLERS $2,769,000 NYC DEP4/30/09
PO-083EWARDS ISLAND ENHANCED NUTRIENT REMOVAL STUDIES - SHARON FACILITIES $3,574,205 NYC DEP6/15/09
TEDSTEMPORARY EVENT DETECTION SYSTEM - CCTV AND OTHER DETECTION SYSTEMS IN TRANS HUDSON PATH TUNNELS VIA PATH NETWORK $5,000,000 PANY&NJ / TISHMAN7/30/09
800 MHZ RBS800 MHZ RADIO BACKUP ANTENNA SYSTEM FOR PATH SECURITY SYSTEM $500,000 PANY&NJ / TISHMAN5/15/09
LIDSLASER INTRUSION DETECTION SYSTEMS FOR 3 PATH STATIONS VIA PATH NETWORK $2,200,000 PANY&NJ / TISHMAN12/31/09
JFK-963CENTRAL TAXI HOLD IMPROVEMENTS - LICENSE PLATE RECOGNITION SYSTEM INFRASTRUCTURE AND TECHNOLOGY SYSTEMS $800,000 PANY&NJ12/31/09
PATH- 214.002REHABILITATION OF PLAZA LIGHTING $680,000 PANY&NJ5/15/09
VARIOUS LGA & JFK GUARD POSTSPERFORMED THE INSTALLATION OF ALL POWER AND TECHNOLOGY FOR THE PERIMETER HARDENING FOR 11 GUARD POSTS AT JFK AND LGA AIRPORT. $3,600,000 PANY&NJ / VARIOUS12/31/09
FAA LGA PIERREHABILITATION OF ELECTRICAL SYSTEMS ON RUNWAY PIER $1,200,000 FAA10/15/10
MF-100.509 WO13Lincoln Tunnel CCTV & Video Analytics $800,000 PORT AUTHORITY NY & NJ / Tishman Technologies3/15/11

 